“Simple and Complete”

Chris Mears writes an interesting blog called Prince Street Terminal and his latest posting really resonated with me.

It’s a short post, but Chris nicely captures the advantages of designing and building what I call an Achievable Layout. He notes that life has been busy for him lately, with the result that even grabbing 15 minutes for a work or operating session is difficult – but when he does find that time, the layout is ready for him to enjoy.

I feel the same way about Port Rowan. Last night, for example, I was airbrushing a project and decided afterwards that I needed to run my airbrush through my ultrasonic cleaner. (It does an amazing job of cleaning the airbrush.) The process takes about 20 minutes, and I didn’t want to leave the parts in the cleaning solution overnight, so I turned on the layout and switched St. Williams.

The thing is, the layout was ready to run – and I can run it by myself. If I had a larger, more complex layout, I would not be able to do that – not without upsetting the set-up for a future, group operating session.

(The Sergent couplers, by the way, worked flawlessly last night.)

But back to Chris: Click on the Prince Street Terminal banner, below, to read his thoughts on this, called “Simple and Complete” – and enjoy if you visit.

 photo PrinceStreetBlogHeader_zpsb1b8a4c3.jpg

Well said, Chris!