CNR 3737 :: more tender work

Someone recently asked me how work was progressing on the CNR 3737 project. The short answer was, “It wasn’t”. The long answer was that Andy Malette and I were both busy with other things and just couldn’t find a free Friday that worked for both of us. That’s fine – it’s a hobby: It fits between the other things in life.

But after a long hiatus, we managed to get together last week and make some progress. This time around, I added railings to the tender:

CNR 3737 Tender Railings

I marked locations for stanchions and soldered a bunch of brass strip in place, leaving each piece longer than needed. I then soldered the railing to the stanchions, using a scrap of strip wood as a non-conductive spacer to make sure they railing was a consistent distance off the tender walls.

My prototype has separate railings along the coal bin, whereas the locomotive Andy is building has one continuous rail that follows the lines from the coal bin down to the rear deck, around the back and back up the other side. I definitely had the easier project.

The rear railing is actually two pieces, soldered in place then trimmed to meet on the stanchion next to the ladder at the back of the tender. the railings simply end behind the coal bin walls.

CNR 3737 Tender Rails

On one of the coal bin railings, a couple of brass fittings are soldered in place at each end. These are the electrical plug-ins for the rear light, which will go on the water tank deck.

After shooting these photos, I did some clean-up. I filed the stanchions flush with the top of the railing. In the process, I managed to break a couple of the solder joints, but the repairs were quick – thanks, in part, to my new low-profile vise, which opens enough to hold an S scale tender body, and which can be used as the grounding point for my resistance soldering unit.

It’s nice to be back at this project. It’s taken a long time and I’m now at the stage where I want to get it done and move onto the next thing. Plus, of course, I want to see the locomotives in action on the S Scale Workshop exhibition layout!

One thought on “CNR 3737 :: more tender work

  1. “I’m now at the stage where I want to get it done and move onto the next thing.”

    I know that stage!! My solution was to completely shut down modelling for almost two months and move houses!! I don’t think I will actually do any modelling at this point until July! It’s been one way to make sure I don’t have any projects on my plate reaching that “I just want this done” phase, as I have slowly ramped down working and packed things away. It’s kept me from starting projects to avoid having half done things move.

    Stephen

Leave a Reply

Your email address will not be published. Required fields are marked *

Please prove you're not a nasty spamming robot thingy * Time limit is exhausted. Please reload CAPTCHA.