“Running Trains” with Chris

 photo Ops-20140406-02_zps5006bdf5.jpg

Chris Abbott visited yesterday and since it was one of the first really nice days of Spring, we spent the afternoon in the layout room. Well, we’d planned this get-together a couple of weeks ago and that’s just the way it goes…

I’ve had some problems recently with derailments, so I invited Chris for a work session. The idea was simple: We’d run a couple of trains and look for problems. We wouldn’t worry about prototype paperwork, proper switching procedures or any of the stuff that we employ during a normal operating session. Rather, we’d cover the line, using the “Mother may I?” method of dispatching and working through all the spurs and other secondary tracks in the process. If we found a problem – a repeatable problem – we would stop and fix it.

Having another person help me with this task would accomplish two things:

– First, Chris was a second set of eyes and fresh opinions about the nature of any problems.

– Second, I would be less likely to overlook or downplay a problem that would require a major rework. (An example of this might be the need to pull a switch point and fabricate a new one. I hate doing that – especially when working over finished scenery – so I’m more likely to wonder “What’s on TV?” when I run into that kind of repair.)

The good news is, we each ran a train to the end of the line and back, working through various sidings – shoving and pulling cuts of cars – and only encountered one problem: A derailment during a backing move through the turnout in front of the Port Rowan station. What’s more, we were unable to repeat the derailment. It could be an issue – or it could’ve been a bit of dirt or loose ballast in the frog. We don’t know. But we left it alone and will keep an eye on that turnout in case it causes more trouble.

For now, it looks like I’ve managed to fix the derailment problems that were plaguing me earlier this year.

And while we didn’t uncover any major problems, it wasn’t a wasted effort: We had a lot of fun – not holding an operating session, but just “Running Trains”…
 photo Ops-20140406-01_zpsd80d8418.jpg

 photo Ops-20140406-03_zps912abe8e.jpg

Chris and I did other things, too:

– We discussed plans for adding a hand crank to control the sector plate. Chris has been thinking about this since we built the plate, but many other things have gotten in the way and it’s never been a priority for either of us. But Chris would like to tackle it now so he double-checked some measurements and has retired to his work shop to build the mechanism. Stay tuned.

– I solicited his input on some plans for future scenery projects in the Lynn Valley and I can now proceed with those. Again, stay tuned.

– We realized that Chris had never tried TouchCab – an app that allows one to use an iPhone or iPod Touch as a wireless throttle. He was impressed, and it was good for me to get reacquainted with the system. I’m going to make a point of using it more often.

– I introduced Chris to Night Train – a dark ale from Junction Craft Brewing. It went down very well.

My wife joined us as we wrapped up the day with a visit to The Caledonian – an always-fun Scottish pub. It’s about a 20-minute walk from home but owners Donna Wolff and David Wolff always make the place feel like a second home – and the walk encourages one’s appetite.

Sundays at The Caledonian mean a traditional roast beef dinner – and this Sunday was particularly special as The Caley celebrated Tartan Day. The whisky-tasting was sold out and the place was busy but Donna found us three spots at the bar. There were Highland Dancers to entertain the crowd – and we had three pours left in our bottle of Edradour Caledonia 12-year-old behind the bar, so it was all good.

(Thanks for the great day of work and fun, Chris – I look forward to the next one!)

7 thoughts on ““Running Trains” with Chris

  1. Trevor,
    I really enjoy how operating sessions on the “Port Rowan” involve work, operations and then a trip to one of the local eateries. Makes for a very nice package

    • Hi Tom:
      It’s even nicer to experience first-hand! 😉
      Seriously, though, the hobby is a social one for me. I do a lot on my own – in the hobby and in other aspects of my life – and I also recognize that for most of my regular visitors, it can be a long trek to get to my place. There aren’t that many layouts in downtown Toronto – not to my knowledge. (David Woodhead is the exception: He’s about seven blocks from me.) So, when people come for a visit, I like to make it an event: Some time for running trains, but also some time to enjoy a meal and something good to drink, plus a chance to catch up on what’s going on in our lives.
      It works well. I know this, because people keep coming back.
      Cheers!

    • Matt:
      They certainly do! Not to mention a haggis main course that even those who don’t like haggis admit is pretty darned good.
      In fact, I’ve had almost everything on the menu and I recommend it all…
      Cheers!

  2. I assume the point of a crank is to have smoother and more repeatable motion on the sector plate? How many turns per inch is optimal? Have you considered a rack and pinion type arrangement with a small gear motor?

    • Hi Seth:
      Good questions as always…
      Right now I align the plate by hand. It works but it’s no elegant.
      Chris is checking several sizes of thread to find something fine enough for fine adjustments but coarse enough that we’re not doing dozens of turns of the crank between tracks.
      I prefer manual operation – it’s literally more “hands on” and I like the tactile experience. Plus, we have a neat crank in the works. So we haven’t explored options involving a motor.
      Cheers!

Leave a Reply to Trevor Cancel reply

Your email address will not be published. Required fields are marked *

Please prove you're not a nasty spamming robot thingy * Time limit is exhausted. Please reload CAPTCHA.

This site uses Akismet to reduce spam. Learn how your comment data is processed.